Worthing price guide
Carpenter cost in Worthing: day rates and fitted work
What a carpenter in Worthing costs: day rates, fitted shelving and stairs, materials, and how to compare two quotes fairly.
The short answer
Use hourly and daily rates to compare defined labour. For fitted shelves, stairs or decking, compare a written total for the same materials, finish, access and fitting scope.
- Check the hours and people included in a day rate.
- Compare supply and fitting together for made-to-measure work.
- Ask each firm to show materials, exclusions and the total payable.
Homeowners getting carpentry and fitted-work quotes in Worthing and nearby.
Two quotes arrive for the same Worthing alcove. One gives a day rate to fit shelves you have already bought. The other includes a survey, made-to-measure units, installation and a finished surface. Both are reasonable ways to price a job. The useful comparison starts when you ask each firm what you would still have to buy or organise yourself.
For small carpentry jobs, compare the hourly or daily labour charge alongside any minimum booking and material costs. For fitted work, compare the total for a written specification. The more measuring, making and finishing that happens before the fitter arrives, the less a day rate tells you about the finished cost.
What Worthing carpentry rates show
HaMuch’s Worthing listings, checked on 12 November 2026, show advertised rates of £23 to £61 per hour and £218 to £366 per day. HaMuch describes its comparison rates as excluding VAT and call-out charges. These are listings for firms serving Worthing with different kinds of work. Treat them as a snapshot of asking rates and confirm the scope and total with the firm.
RGS Carpentry’s October 2026 guide puts first and second fix work at £280 to £380 per day in the South East, with materials extra. It comes from a joinery workshop in Surrey, so use it as a regional comparison alongside HaMuch’s Worthing listings. Ask for a written quote for your own job. A labour rate does not tell you whether the quote covers materials, delivery, disposal or finish.
For an hourly booking, confirm the minimum time and how travel or a trip to collect parts is charged. For a day rate, ask how many people are included, what the day covers and how any return visit is priced. Ask for an estimate of the time as well. A carpenter bringing the right parts and equipment may complete a defined list of tasks in one visit. Fitted work can involve a separate survey and time in the workshop before the first fitting day.
Compare the job you want finished
| Work | Published comparison | What to put in both quotes |
|---|---|---|
| Fitted shelving or alcove units | The RGS Carpentry 2026 Surrey guide lists £2,400 to £4,500 for a matched pair of cupboards with open shelves, including materials and fitting. | Shelves only or shelves over cupboards, dimensions, load, material, visible edges and final finish. |
| New staircase | Ask for a fitted price based on the opening. The flight, handrail and guarding can be priced as separate items. | Standard or made to measure, opening and finished floor levels, removal, handrail, guarding and making good. |
| Balustrade | Ask for a separate site-specific quote. A stair price may include a different guarding specification. | Length, location, existing fixings, handrail, posts, infill and any work to the support below. |
| Timber decking | Ask for a price per square metre for boards and subframe. List steps and guarding separately so the area rates can be compared. | Board and subframe specification, access, disposal, steps, guarding, supports and fixing specification. |
The Surrey alcove benchmark was checked on 12 November 2026. Ask the quoting firm to show what applies to your job. A pair of units built around a fireplace includes a different set of components from a few open shelves. A flight between finished floors also has a different scope from altering the opening, moving services and reworking the landing around it.
On a fitted unit, make sure the quoted finish is the one you expect to live with. An unfinished unit for your decorator and a fully finished unit leave different work at handover. Ask for the material and the finish on the front, inside and exposed edges. If you are comparing a straight run with a unit that returns around a chimney breast, get the footprint on paper. Working around that extra corner can add fitting time even if the shelf area barely changes.
Put VAT, materials and exclusions on one sheet
HMRC’s VAT guidance gives a standard rate of 20%. The usual compulsory registration threshold is more than £90,000 in taxable turnover over a rolling 12 months, with a separate test if the next 30 days’ expected turnover alone will exceed the threshold. A business can register voluntarily. As a calculation only, £1,000 before VAT becomes £1,200 with VAT at 20%. Ask each firm for the total you would pay and whether VAT is already included where it applies.
For materials, ask whether the quote uses a fixed specification or an allowance that can change when you choose a finish. Identify who is buying the hardware and what happens if you change your mind after it has been ordered. A clear quote also lists delivery, removing old materials, protection of nearby surfaces and who makes good the plaster or paint. If a specialist is needed for another part of the job, check whether you pay them separately.
Ask how the firm handles a discovery. Suppose the existing balustrade comes off and the support beneath it needs work. The useful written record describes what was found, the proposed change, the difference in cost and the effect on completion. Agree who signs off the change before it goes ahead. That makes a genuine discovery much easier to separate from work you thought was included in the first place.
Have a list of fittings to price?
Send the dimensions, any finish you have chosen and a photo of the space. Flag anything you are supplying yourself.
What moves the price on a Worthing job
Start with access. On a terrace or in a flat, a long stair component or a built-in unit may have to come in as smaller sections and be assembled inside. Tell the carpenter about parking restrictions, shared access, narrow stairs and where materials can be left. If only one part of the home can be worked on at a time, say so when you ask for the price. The quote can then allow for working in an occupied home.
Then describe what the new work has to meet. On a stair, the opening, finished floor levels and surrounding wall can matter as much as the chosen timber. Approved Document K covers stairs and guarding in England. If the work involves changing an opening or providing guarding where there is a drop, discuss the scope with the designer or Adur & Worthing Building Control before committing to a price. A like-for-like repair has a different brief from replacing the whole flight.
For a deck exposed to weather, look below the boards. Ask whether the quote includes the supports, how water can drain away and what fixings are specified for the exposure and timber. The Timber Decking & Cladding Association guidance explains why corrosion resistance matters. Compare two quotes with the same subframe and fixing specification before drawing conclusions from their rates per square metre.
What to send when you ask for a quote
Send a postcode, a wide photograph showing the room or garden and a closer photograph of the area the work will touch. Put rough dimensions in the message and say which decisions are settled. If you want a cabinet that holds an awkward object, send the object’s dimensions too. If the flooring or plasterwork is still to come, say who is doing it. The carpenter can then tell you which measurements need to wait.
Julian’s Preston Park work before founding Tidal Drift shows how a staircase and fitted storage can be planned around one set of rooms. For outdoor work, the Dorset tree deck shows the framing behind the finished surface. Its school setting and scope are different from a domestic deck, but the photographs are a useful reminder to ask what sits under the boards.
Tidal Drift is based in Worthing, with a workshop near Chailey. You can see the range of work in the project portfolio and the kinds of timber work covered in our carpentry FAQs. If the fitted work is part of an extension or renovation, share the drawings as well as your list of fittings. That helps identify where the building scope ends and where the joinery begins.
I met Julian over twenty years ago. He has done the vast majority of work I have needed from garden stairs and decking to interior balustrade, shelving, renovation works and more.
Pat Thornton, published Tidal Drift testimonial
Before you choose a quote
Read both documents with the same practical question in mind. If the work stopped exactly where the quote says it stops, could you use the room or deck as planned? Mark the parts that would still need finishing, the items you are buying and any return visits. Ask the firm to write down assumptions about the existing wall, opening or subframe. Keep the agreed specification with the quote. It is the quickest way to resolve a question later about which finish or fitting was included.
Keep a note of items that are ready to order and items that still need approval. For example, if you have agreed the shape of the alcove unit but are still deciding between a painted finish and visible timber, ask for those options on the same drawing. That keeps the comparison focused on the finish. If the two quotes also use different board thicknesses or hinge types, get those details clarified before deciding what the upgrade costs.
For small jobs, combine tasks only where they are ready for the same visit. A shelf bracket, a loose tread and a change to a cupboard door can make a useful list if the fitter knows what to bring. An item that needs a survey or a made-to-measure part is better listed separately. That way you can compare a useful half day or day of work without assuming that every item will be finished on the same visit.
What clients and collaborators say
“I would highly recommend Julian and Tidal Drift to anyone considering construction work.”
Jake White, Jake White Architecture
“they were utterly professional and personable”
Bryony Orsborn, Findon client with a family connection
“Tidal Drift were an absolute pleasure to work with from start to finish.”
Helen Whitaker
Frequently asked questions
How much does a carpenter cost per day in Worthing?
The Worthing rates section compares a range of advertised day rates with one local firm’s guide. Ask how many people and hours are included and what the day rate covers.
How much does a carpenter charge per hour in Worthing?
Use the advertised hourly range in the Worthing rates section as a starting point. Check minimum booking, call-out charges, materials and the total payable.
Should I ask for a day rate or a fixed price?
A day rate can suit a defined list of fitting or repair jobs. Ask for a written fixed scope and price for fitted work that needs measuring, making, supplying and installing.
Are a carpenter’s materials included in a day rate?
Ask the firm to confirm. Compare labour, materials, fixings, delivery, disposal and any VAT using the total you would pay.
Get the scope clear before you compare
Share your postcode, the job you want finished and any access constraints.
Sources
Sources checked 12 November 2026.
- HaMuch, Worthing carpenter and joiner listings (snapshot on 12 November 2026)
- RGS Carpentry, South East day-rate guide (October 2026)
- RGS Carpentry, Surrey fitted-work prices (2026)
- HMRC, charging VAT and calculating the total
- HMRC, when to register for VAT
- GOV.UK, Approved Document K, stairs and protection from falling
- Adur & Worthing Councils, Building Control
- Timber Decking & Cladding Association, decking fixings